Low voltage rough-in checklist

Run the data, TV, speaker and security wire before drywall, labeled at both ends.

12 itemsIn 4 groups
Tick onlineSaved in your browser
PrintableOr save as PDF
Items done
0 of 12
Saved in this browser as you go
Nothing you type here is sent to Koira. Print a blank one for the truck, or fill it in here first.

Low voltage rough-in checklist

koira.ai/checklists/low-voltage-rough-in-checklist
Plan
Run
Label and protect
Record

What this checklist covers

Wire is cheap before drywall and expensive after. Run more than the owner asks for, label both ends and leave the map; the next person to add a camera will thank you.

How to use it

Tick each item as you go. The sheet saves in this browser, so you can close the page and come back. Print a blank copy for the truck, or fill it in on your phone and print or save it as a PDF for the customer at the end.

With Koira: Estimates and change orders

Anything the walkthrough turns up that is outside the scope goes on a new estimate, signed on the customer's phone before you do it. Koira keeps the original, the change and the photos together on the job.

Last checked October 9, 2026. This page is general information, not legal or tax advice. Rules change and differ by state and city, so confirm with the agency named before you act.

FAQ

What is low voltage rough-in?

Running data, TV, speaker, doorbell and security wiring before the walls are closed.

Why label both ends?

So every cable can be found and terminated at the panel.

Should low voltage be kept apart from power?

Yes, where your code and the equipment makers require it.

Is spare conduit worth it?

It makes future wiring easy without cutting walls.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Low Voltage Rough-In Checklist: Data, TV and Security Wiring | Koira