Free punch list template

Walk the job with the owner, write down everything left to fix or finish, say who does each item and by when, and get it signed off once it is done. Works on a phone at the walkthrough.

FreeNo email, no sign-up
Works it outThe math is done as you type
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Punch list details
Items
Item 1
Item 2
Item 3
items on this punch list
0
Punch list
Run this in Koira for freeKept in this browser only. Nothing you type here goes to Koira. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Punch list

What to fix or finishWhereWho fixes itDueDone (date or initials)
Add a item to see it here.
Contractor
Customer or owner
Date

What a punch list is

A punch list is the list of small things left at the end of a job: a scuffed wall, a missing cover plate, a door that rubs, a caulk line that needs redoing. It comes out of a walkthrough near the end, with the owner, the general contractor or both. Finishing it is what stands between you and the final payment.

How to write a good item

  • Say exactly what and where. "Touch up paint, hall wall left of the bath door" beats "touch-ups".
  • One problem per line, so each one can be checked off.
  • Name who fixes it. On a job with subs, every line has an owner.
  • Give a due date for the whole list and for anything that holds up move-in.
  • Take a photo of anything that could be argued about later.

Closing it out

When every line is done, walk it again and get the customer's signature on the list. That signed list, with a certificate of completion, is your record that the job is finished and the final invoice is due. Keep the list short by running a quality check of your own before the walkthrough.

More free templates

FAQ

What is a punch list in construction?

A list of items that still need fixing or finishing near the end of a job, usually made during a walkthrough with the owner or general contractor. Once the list is done and signed off, the job is complete.

Who makes the punch list?

Usually the owner, architect or general contractor walks the job and writes it, and the contractor confirms each item. On a small residential job, the contractor often walks it with the homeowner and writes it together.

When should the punch list walkthrough happen?

When the work is substantially complete, before the final payment and before the customer moves furniture back or moves in. Too early and the list is long; too late and items get missed.

Can a customer keep adding to the punch list?

Agree up front that the list made at the walkthrough is the list, and that new requests are priced as extra work. Write the walkthrough date on the list and get it signed.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Punch List Template for Contractors (PDF, Word and CSV) | Koira