What is floor leveling compound?

Floor leveling compound is a pourable cement based mix that flows out on its own to fill low spots and leave a flat floor. Also called self-leveling compound or self-leveler, it goes over concrete or a primed wood subfloor before tile, vinyl plank or other flooring. Most mixes can be walked on within hours.

What self-leveling compound means

Self-leveling compound is a pourable cement based mix that flows out to fill low spots and make a flat floor for tile or flooring.

Also called floor leveling compound, floor leveler, self-leveler, SLU.

Where it matters on a flooring job

Floor flatness problems show up after the floor is down, as hollow spots and lippage. Measure with a long straightedge, price leveling by the bag, and give it time to cure.

What it costs

Jobs that involve self-leveling compound are priced in the tile installation cost guide: about $2,100 typical, usually $950 to $5,000. The guide shows its sources and what moves the price. The flooring cost calculator prices a job line by line.

Work it out

For flooring installersIf you do this work for a living, Koira handles the office side of it: quotes, invoices, booking, follow ups and your website, in one place.Koira for flooring installers

Self-leveling compound questions

How thick can floor leveling compound be poured?

It depends on the product. Standard mixes are made for thin pours, and deep fill versions or mixes with added aggregate handle deeper low spots. The bag lists the minimum and maximum depth, and pouring outside it leads to cracking or a weak, dusty surface.

Do you need to prime before self-leveling compound?

Yes. Primer seals porous concrete so it does not pull water out of the mix too fast, and it helps the compound bond. Wood subfloors need primer too, and often metal lath, following the maker's instructions. Skipping primer is a common cause of pinholes and a poor bond.

Can you use floor leveling compound on a wood subfloor?

Many products allow it over a solid, well fastened plywood subfloor with the right primer and sometimes lath. Seal gaps and edges first so the liquid does not run through to the room below. Leveler flattens a floor but does not stiffen it, so fix any bounce before you pour.

How long does self-leveling compound take to dry before flooring?

Most mixes can be walked on within hours, but tile, vinyl and wood each have their own wait before install, and cool, humid rooms slow drying. The bag gives the time for each floor covering, and moisture sensitive floors such as luxury vinyl plank may need a moisture test first.

What is the difference between self-leveling compound and floor patch?

Self-leveling compound is poured and spreads itself across a large area. Floor patch is a stiffer mix troweled by hand into dips, cracks and seams. Patch suits small spots, and leveler suits a whole room with uneven areas or a floor that needs to be flat for large tile.

Can floor leveling compound be left as the finished floor?

Standard underlayment levelers are made to be covered. Some toppings are rated as a wear surface and can be sealed or polished, but an ordinary leveler left bare will dust and wear. Use a product made for exposed use if no flooring will go over it.

Built for flooring installers. Start with a free AI report.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.